We are thrilled to announce the successful implementation of an advanced fume containment system for a steel melting furnace, enhancing environmental safety and operational efficiency.
Project Highlights:
- Design and Installation: Our skilled team has ingeniously designed and installed a dual-stage extraction system that effectively contains and evacuates flue gases during critical steel melting, charging, and tapping phases.
- Technology: Equipped with a powerful 1MW Fan, our system ensures optimal air quality and complies with stringent safety standards. IOT/Industry 4.0/Remote Connectivity.. complied system.
- Compliance: Fully compliant with local governmental norms in Saudi Arabia, setting a benchmark for industry practices in the region.
This milestone not only represents a significant technological leap but also reinforces our commitment to environmental stewardship and our ability to meet complex engineering challenges.

